01
Inventory before demolition
List wood, drywall, cabinets, flooring, shingles, masonry, metal, fixtures, and possible regulated material separately. A mixed pile is harder to evaluate after the work begins.
02
Keep hazardous material out
Paint, solvents, fuel, batteries, asbestos-containing material, chemicals, and other regulated waste cannot be added to a normal construction load. Use the proper specialized program or contractor.
03
Plan heavy debris carefully
Concrete, dirt, tile, plaster, and roofing can reach towing and facility limits at low container volume. Get approval for the material and quantity rather than filling by eye.
04
Keep the job site loadable
Position the trailer where crews can work without blocking emergency access, neighbors, or required parking. Maintain a safe path and do not build debris above the container edge.
05
Use documentation
Keep project notes, photos, scale tickets, and disposal records when the work or contract requires them. Good load information also improves scheduling and final cost accuracy.
Official references
Disposal and placement rules can change and may differ by city, facility, property, and material. Verify current requirements for the exact address and load before work begins.