01
Start with the roofing system
Tell Big Dumpz whether the job involves asphalt shingles, tile, metal panels, wood shakes, underlayment, flashing, gutters, insulation, or roof decking. These materials differ in weight, handling, and disposal requirements, so the trailer plan should match the actual tear-off.
02
Estimate the tear-off before delivery
Roof area alone does not describe the load. The number of roofing layers, deck repairs, water damage, packaging, and removed wood can all change the amount and weight. Ask the roofer for the measured roof area and expected layers, then share that information before booking.
03
Treat shingles and tile as heavy debris
Roofing material can reach a safe hauling limit while the trailer still appears partly empty. Never fill to the top by appearance alone. Follow the approved material plan, distribute the load evenly, and stop when the agreed limit is reached.
04
Control nails and sharp material
Keep shingles, flashing, broken tile, fasteners, and cut metal inside the trailer. Sweep the loading path and placement area throughout the job. Do not leave sharp debris on the driveway, street, sidewalk, or around tires where it can injure people or damage vehicles.
05
Check older material before disturbance
Some older roofing systems and related building materials may contain asbestos. Do not place suspected asbestos-containing material in a standard roofing load. Florida DEP publishes inspection, notification, handling, and disposal requirements for regulated projects, and specialized professional help may be required.
06
Choose placement around the roofing workflow
The trailer should be close enough for controlled loading without blocking emergency access, damaging landscaping, or interfering with the roofing crew. Confirm driveway condition, gates, slopes, overhead lines, eaves, parked vehicles, and the tow vehicle's exit path.
07
Understand the final disposal cost
Big Dumpz rental pricing includes local delivery and scheduled pickup. Applicable disposal weight is billed from the facility's scale record. Roofing loads may also require special handling or a different disposal route, so accurate material details matter before the trailer arrives.
08
Keep records for the project
Photograph the empty placement area, the loaded trailer, and any material that required separate handling. Contractors should retain the scale ticket and disposal documentation when the customer, contract, insurer, or project file requires it.
Official references
Plan the next step
Disposal and placement rules can change and may differ by city, facility, property, and material. Verify current requirements for the exact address and load before work begins.